1.Describe TWO objectives of Boeing’s Dreamliner development strategy (5pts each answer).
Objective 1:
Objective 2:
2.Select TWO of the following types of failure and describe how they were exhibited by Boeing in its Dreamliner development strategy (10pts each answer).
3.Boeing’s default framework when deciding its Dreamliner development strategy was that changing its traditional design and manufacturing process for a new and innovative aircraft would save time and costs. Name TWO assumptions underlying Boeing’s default framework that proved to be false (5pts each answer).
Assumption 1:
Assumption 2:
4.What were the proximate, intermediate, contributory and root causes of Boeing’s Dreamliner production delays and cost overruns? Briefly explain your answers (5pts each answer).
Proximate cause(s)
Intermediate cause(s):
Root cause(s):
Contributory factor(s):
5.Select ONE of the following failure modes that could have been analyzed in a FMEA before Boeing’s decision to outsource 70% of the Dreamliner’s development and manufacturing (10pts).
Briefly describe the consequences and estimate the severity and probability of your selected failure mode, based on what Boeing knew in 2003.
Component:
Potential consequences:
Probability (%) of occurrence:
Severity of impact (1 = low, 5 = high):
6.Select a SECOND one of the following failure modes that could have been analyzed in a FMEA before Boeing’s decision to outsource 70% of the Dreamliner’s development and manufacturing (10pts).
Briefly describe the consequences and estimate the severity and probability of your selected failure mode, based on what Boeing knew in 2003.
Component:
Potential consequences:
Probability (%) of occurrence:
Severity of impact (1 = low, 5 = high):
7.Select a THIRD one of the following failure modes that could have been analyzed in a FMEA before Boeing’s decision to outsource 70% of the Dreamliner’s development and manufacturing (10pts).
Briefly describe the consequences and estimate the severity and probability of your selected failure mode, based on what Boeing knew in 2003.
Component:
Potential consequences:
Probability (%) of occurrence:
Severity of impact (1 = low, 5 = high):
8.Select a FOURTH one of the following failure modes that could have been analyzed in a FMEA before Boeing’s decision to outsource 70% of the Dreamliner’s development and manufacturing (10pts).
Briefly describe the consequences and estimate the severity and probability of your selected failure mode, based on what Boeing knew in 2003.
Component:
Potential consequences:
Probability (%) of occurrence:
Severity of impact (1 = low, 5 = high):
CASE STUDY 1 | Boeing Dreamliner | Your name | Max Points | 100 | ||||||||||||||||||||||||||||
Question 1 (5pts each answer, 10pts total) | ||||||||||||||||||||||||||||||||
Describe TWO objectives of Boeing’s Dreamliner development strategy.
|
||||||||||||||||||||||||||||||||
Question 2 (10pts each answer, 20pts total) | ||||||||||||||||||||||||||||||||
Select TWO of the following types of failure and describe how they were exhibited by Boeing in its Dreamliner development strategy:
– Market failure – Operational failure – Financial failure – Strategy failure
|
||||||||||||||||||||||||||||||||
Question 3 (5pts each answer, 10pts total) | ||||||||||||||||||||||||||||||||
Boeing’s default framework when deciding its Dreamliner development strategy was that changing its traditional design and manufacturing process for a new and innovative aircraft would save time and costs. Name TWO assumptions underlying Boeing’s default framework that proved to be false.
|
||||||||||||||||||||||||||||||||
Question 4 (10 pts for each part, 40pts total) | ||||||||||||||||||||||||||||||||
Select FOUR of the following failure modes that could have been analyzed in a FMEA before Boeing’s decision to outsource 70% of the Dreamliner’s development and manufacturing. Briefly describe the consequences and estimate the severity and probability of each of your selected failure modes, based on what Boeing knew in 2003.
*Severity scale: 1 = low, 5 = high |
||||||||||||||||||||||||||||||||
Question 5 (5pts for each answer, 20pts total) | ||||||||||||||||||||||||||||||||
What were the proximate, intermediate, contributory and root causes of Boeing’s Dreamliner production delays and cost overruns?
Briefly explain your answers.
Proximate cause(s):
Intermediate cause(s):
Root cause(s):
Contributory factor(s):
|
There are four case studies throughout the course. In these case studies, you will unpack and explain the application of course principles to real contexts. These cases serve as test runs of the Business Impact Analysis assignment, in that they’re intended to help you think through the myriad issues at play in identifying risk within a company or industry. These case studies are synchronized with the provided reading materials.
For case study #1, review the Boeing Dreamliner case study, then answer questions 1-8. Copy and paste the question which you’re answering into the answer box. Be precise and limit each answer to 75 words or less.
if you wish to draft your answers before submitting them, you may use this word document